Desalination Equipment - Client Questionnaire

Desalination Equipment - Client Questionnaire

MED , MVC , RO

m3/day
ppm-TDS
(Purity normally required: Potable & Indastrial water 20-50 ppm Boiler Feed Water 2-10 ppm)
Feed Water Supply
ppm-TDS
Temperature
°C
°C
°C
m3/hr
Site Conditions
meters
meters
Ambient conditions
Temperature
°C
°C
°C
%
Availability and type of energy sources
High pressure steam (above 4 ata)
kg/hr
ata
°C
US$/ton
Low pressure steam (below 1 ata)
kg/hr
ata
°C
US$/ton
Electric Power
kW
V
CPS
US$/kWh
Compressed air for instruments
1/min
atg
Cooling water
m3/hr
°C
°C
IDE standard offer normally includes the design, manufacture, delivery to the port of embarkation and on-site technical supervision of erection and commissioning. The following items are out of the scope of IDE standard offer and accordingly are subject to our separate quotation. Please check those additional items required as follows:
We shall be pleased to give you an estimate of water production costs after you provide the following information : interest rate, depreciation period, number of work days per year, heat source costs (unit prices of steam or fuel), electric power costs and personnel rates.
Raw Water Analysis
(Please provide the following raw water analysis, if available)
ppm
ppm
ppm
ppm
ppm
ppm
ppm
ppm
ppm
ppm
ppm
ppm
ppm
ppm
ppm
ppm
ppm
ppm
ppm
ppm
ppm
ppm
NTU
ppm
Units
ppm
ppm
ppm
ppm
ppm
ppm
Image CAPTCHA
Enter the characters shown in the image.
IDE Technologies 2011 © All rights reserved
Powered & Designed by comrax