Turkmenbashi, Turkmenistan (EPC, MVC Plant)

Turkmenbashi, Turkmenistan (EPC, MVC Plant)

 JGC, Turkmenbashi, Turkmenistan
2 x MVC – 2,940 m3/day
 


Client:

JGC Corporation, Japan

Site:

Turkmenistan Refinery, Turkmenbashi, Turkmenistan

Project Type:

Engineering Procurement and Construction (EPC)

Process:

MVC (Mechanical Vapor Compression)

Total Capacity:

5,880 m3/day

Commissioned:

2000


Project Data:

Capacity of each unit:

2,940 m3/day

Number of units:

2

Total desalination plant capacity:

5,880 m3/day

Plant footprint dimensions:

40 x 20 (m x m)

Maximum specific electrical consumption:

8.2 kWh/m3

Steam quantity required

up to 1.5 ton/hr per unit (at 3.2 atmg)

Feed water salinity:

16,500 ppm TDS

Product water salinity:

< 5 ppm TDS

Feed water temperature:

(-1) - 320C

Commissioning date:

End of 2000